Case Study, Upgrade of the mixing plant (PART 6)

ANALYSIS OF RESULTS (Test and checks results) Read more in; Case Study, Upgrade of the mixing plant (PART 6)
6 August 2022

Case Study, Upgrade of the mixing plant (PART 5)

Cost Analysis ;Cost-Benefit Analysis measures the financial impact of the project .Case Study, Upgrade of the mixing plant (PART 5)
29 July 2022

Case Study, Upgrade of the mixing plant (PART 4)

Testing will be done in stages from components to completed circuits then the whole system.
22 July 2022

Case Study, Upgrade of the mixing plant (PART 3)

The project building /installation will be done in parallel with the existing system where possible; this allows the plant to run smoothly while upgrading is taking place.